Downloads
Filter Document category wise
Title | Date | View / Download |
---|---|---|
Circular 07.05.13 Single Bid and Committee Restructuring under PMGSY |
Accessible Version :
View(3 MB)
|
|
Appointment of external Audit for 2018 |
Accessible Version :
View(5 MB)
|
|
Amendment directions as per observation made by CAG Auditor |
Accessible Version :
View(158 KB)
|
|
Clearance Letter Uttarakhand |
Accessible Version :
View(56 KB)
|
|
Closed PMGSY roads on 6 July 2016 |
Accessible Version :
View(56 KB)
|
|
Contact NUMBER Of All AE EE SE and Zonal CE |
Accessible Version :
View(56 KB)
|
|
Corrigendum for date extension |
Accessible Version :
View(42 KB)
|
|
Corrigendum for Appointment of external audit for 2018 |
Accessible Version :
View(385 KB)
|
|
ECOP Documents |
Accessible Version :
View(4 MB)
|
|
Directions as per observation made by CAG Auditor |
Accessible Version :
View(3 MB)
|
|
Guidelines for the design of flexible pavements for low volume rural roads (IRC:SP:72-2015) |
Accessible Version :
View(4 MB)
|
|
Labour Act |
Accessible Version :
View(3 MB)
|